Market
PBI Long Term Parking Structure No. 2
Palm Beach International Airport
Project Details
TUTOR PERINI AFFILIATES
Tutor Perini Building Corp.
Construction Manager
Contract Amount: $61 Million
OWNER
Palm Beach County Department of Airports
LOCATION
West Palm Beach, FL
ARCHITECT
Walker Parking Consultants/AECOM
SIZE
1.4 Million Square Feet
COMPLETION
2007
Project Description
This project was a seven story, 1,421,000-square-foot, precast concrete parking structure. It included all related site improvements as well as the construction of both vehicular bridges to tie this garage into an adjacent parking structure, as well as a pedestrian bridge that ties into the existing Airport Terminal. To facilitate use of the pedestrian bridge, two elevators as well as five stair towers were constructed. This project also included related revisions to existing electrical, water and drainage systems as required.
Additional work items within this project include related structural steel framing and railings, required sealants and coatings, signage and directional signage, new toll booths, landscaping and irrigation, pedestrian bridge interior finishes, garage lighting, fire sprinkler and fire alarm systems, and minor revisions to the adjacent existing parking garage- as required to accommodate this new garage.