Facebook East Campus
Formerly Oracle, Sun R&D Campus
Project Details
TUTOR PERINI AFFILIATES
Rudolph and Sletten, Inc.
Construction Manager at Risk
Contract Amount: $98 Million
OWNER
Oracle Corporation (formerly Sun Microsystems)
LOCATION
Menlo Park, CA
ARCHITECT
BAR Architects and Bottom Duvivier
SIZE
1 Million Square Feet
COMPLETION
1995
Project Description
This nine-building corporate campus was built under a multi-phase plan. Phase I included shell and core construction of two 3-story and one 2-story office buildings, as well as the 2-story central facility, which houses the campus cafeteria and main receiving area. The finished structure provides over 438,000 square feet of floor area on a site that now contains more thanĀ one million square feet of building space.
Phase II included three buildings built on Bay Mud, including one 2-story and two 3-story buildings. Shell construction included site development work, rooftop HVAC equipment, and exterior lighting.
Buildout included employee recreation facility, Visitors Center and sitework.