Summit Rancho Bernardo Office Building

Project Details

TUTOR PERINI AFFILIATES

Rudolph and Sletten, Inc.
Construction Manager at Risk
Contract Amount: $44 Million

OWNER
Jay Paul Company

LOCATION
San Diego, CA

ARCHITECT
DES Architects + Engineers

SIZE
200,000 Square Feet

COMPLETION
2009

Project Description

This five-story, multi-tenant, Class A office tower was designed and registered for LEED Silver CS but achieved LEED Gold CS. During construction, waste management practices resulted in the recycling of over 93% of construction waste. Recycled material incorporated into the building accounted for over one-third of all material used in the project. The building envelope as well as the mechanical and electrical systems achieved 17.4% better than Title-24 standards. The project also included sitework and basketball and volleyball courts.

Awards

LEED Gold