Market
LM 6000 PC Power Plant
Project Details
TUTOR PERINI AFFILIATES
Perini Management Services, Inc.
Prime Contractor
Contract Amount: $71 Million
OWNER
U.S. Army Corps of Engineers - Middle East District
LOCATION
Buzugan, Iraq
ARCHITECT
Tetra Tech, Inc.
Power Engineers
SIZE
40 Megawatts
COMPLETION
2004
Project Description
Perini Management Services furnished and installed a 40-megawatt LM6000 PC dual fuel gas and distillate turbine generator set in southwestern Iraq under the Restore Iraqi Electricity Program. This was a completely new power station at a remote desert location. The scope included all site preparations; supply, installation, and commissioning of the generator set and switchgear; engineering and construction of the plant substation and interconnection; and complete ancillary facilities (diesel fuel containment tanks, fuel treatment and forwarding systems, and a natural gas compressor).
Awards
Government Performance Evaluation - Outstanding
“Your can-do attitude and spirit of cooperation were even more relevant with the many challenges you encountered on this project- in areas such as security and logistics. Perini's management has demonstrated their commitment to partnering with the Corp of Engineers to produce quality work, while remaining conscious of cost and schedule.”USACE Contracting Officer