Purple Line Extension, Section 2

Project Details

TUTOR PERINI AFFILIATES

Tutor Perini Civil
Design-Build Contractor
Contract Amount: $1.4 Billion

Fisk Electric Company
Electrical Subcontractor
Contract Amount: $156 Million

Becho, Inc.
Support of Excavation Subcontractor
Contract Amount: $24 Million

Desert Mechanical Inc.
Mechanical Subcontractor

OWNER
Los Angeles County Metropolitan Transportation Authority

LOCATION
Los Angeles, CA

ARCHITECT
STV Incorporated

SIZE
2.6 Miles

COMPLETION
2025

Project Description

From the current terminus at Wilshire/Western, the Purple Line Extension will extend westward for about nine miles with seven new stations. It will provide a high-capacity, high-speed, dependable alternative for those traveling to and from Los Angeles’s “second downtown.” Section 2 of the three sections will deliver 2.55 miles of twin-bored tunnels and two new stations at Wilshire/Rodeo and Century City Constellation.

In January 2017, Phase Two of the project, which will extend trackage 2.6 miles (4.2 km) further to Century City, was awarded a $1.6 billion grant from the Federal Transit Administration, covering the majority of the $2.6 billion estimated cost of the project. On January 27, the Metro board awarded a $1.37 billion construction contract to a joint venture between Tutor Perini Corporation and O&G Industries, with construction scheduled to be completed by 2025.

 